Serenity Viruksha:

Luxury Meets Serenity

The project aims to elevate the standard of luxury living to new heights with its unique positioning and unparalleled level of exclusivity by introducing the concept of 1 apartment per floor for this project.

Project Information

Project Location:

D No.C-73, Thiruvengadam Nagar Park Avenue, Ambattur, Chennai – 600053.

Project Type:

Apartments

Area:

1209 / 980 Sq Ft

Total Floors:

5 Floors

Bedrooms:

3 BHK

Total No. of Units:

10 Units

Units available:

1 Unit

Salient Features

of Serenity Eden

Site & Floor

Plans

Specifications

of Serenity Eden

FoundationPile Foundation
  
Super StructureRCC Framed Structure with Brick Walls.
Main Door8′ high engineered door with natural teak veneered, Stained & PU Lacquer Polished.
 
Bedroom & Bathroom Doors8′ high European steam beech wood with laminate shutters.
 
WindowWooden finish UPVC windows.
InternalAll internal walls shall be plastered with Two Coat Putty, One coat Primer, Two Coat Painting (Nippon or Equivalent).
 
ExternalAll external walls to be finished with Texture paint along with one coat of primer and two coats of exterior emulsion paint.
FlooringItalian marble in living, dining, pooja room & Kajaria or equivalent brand for Bedrooms & kitchen.

 

Electrical Home Automation will be provided for lights, fans. 3 phase supply provided. Distribution board with MCB and ACCL Standard concealed wiring Havells or Equivalent Brand. Switches will be modular, DG backup upto 5 amps capacity for all apartments, lift & common area.
PaintingNippon matex gold will be provided for Interior painting. Texture painting for exterior painting.
LiftsSix Passenger Johnson Lift or equivalent brand will be provided.
 
CCTVAll common areas will have CCTV cameras installed.
KitchenPolished Granite Platform with Carysil sink or Equivalent brand.
BedroomLarger windows with 3 60 degree ventilation.
BathroomVilleroy and Boch or Equivalent Bathroom Fittings.
LandscapingProfessionally designed landscaping provided on the Terrace Area & Stilt Floor.

Payment Schedule

Level

Payment Percentage

Intial Payment

30%

On Completion of Foundation

15%

On Completion of Ground Floor Roof Slab

8%

On Completion of First Floor Roof Slab

8%

On Completion of Second Floor Roof Slab

8%

On Completion of Third Floor Roof Slab

8%

On Completion of Third Floor Roof Slab

8%

On Completion of Brickwork in the Respective Flat

10%

On Handing Over

5%

Location

Highlights

Landmarks

from
Rakki Cinemas

from
Koyembedu Bus stand

from
Ambattur railway Station

from
Ambattur OT Bus Stop

from
TI Matriculation
Hr. Sec. School

from
Sir Ivan Stedeford Hospital

Construction

Status

Construction

Status

Our

Partners

Have any Queries?

Reach Out to us Now

    Our

    Completed Projects